Ramp-up
Nouveau pas

2011

aa

2011

Increase in capital of Managem and opening up to the group’s employees.
Creation of Manadist to reinforce the Group’s trading structure.

2012

aa

2012

Start-up of gold production at Bakoudou in Gabon.

2013

aaa

2013

Beginning of production of Copper at Jbel Laâssal and Silver in the extension project at Imiter.
Launch of the waste processing plant in the Guemassa polymetals plant.

2014

aa

2014

Beginning of Copper production in the Oumejrane project. Start-up of the SMI plant extension.

2016

aa

2016

Agreement with Wanbao Mining for copper projects in the DRC.Partnership with Avocet Mining PLC for the Tri-K Gold mine in Guinea

2017

aa

2017

Acquisition of a prospecting permit in Ivory Coast Launch of extension works for the Gold plant in Sudan.
Extension of the SMI plant in Morocco.

2018

SUDAN

2018

-Construction of an industrial gold processing plant in Sudan

2020

Pumpi

2020

-First production of copper cathodes at the Pumpi mine in the DRC

2021

trik

2021

-Start-up of gold production at the Tri-K mine in Guinea

-Start-up of cobalt production at the Pumpi mine in the DRC

2022

tizert

2022

-Start of construction work on the Tizert copper project;

-Agreement to acquire from IAMGOLD the Bambouk assets, strategic assets comprising mines in Senegal, Mali and Guinea;

-Partnership with Glencore to produce cobalt from recycled batteries;

-Partnership with Renault for the supply of low-carbon Cobalt Sulfate for electric batteries.

2023

BA

2023

- Finalization of the acquisition of gold assets in Senegal from IAM Gold.

- Creation of a joint venture dedicated to accelerating the Group's digital transformation projects. 

- Approval of the National Investment Commission's decision to grant strategic status to the Tizert project.

2024

2024